It's been a while since I posted last, its been a little busy! This Shower stall was done around Christmas time, the original fibreglass base was incorrectly installed and was leaking into the wall behind. We took it apart, got rid of the base since the drain location was done incorrectly underneath and retiled it so that it won't leak again... You wouldn't know it wasn't this way the whole time, a shame it wasn't done right to begin with!
|
The old base partially ripped-out. |
|
New base done with the Kerdi waterproofing system, every shower should be done this way! |
|
The new finished product, the way it should have been done the first time! |